Gorad Line Performance · Production

One honest OEE per line

See how well each line is really running, and why it stops. Counts and stops come straight from the machines, so every loss is recorded without anyone writing it down.

The problem

OEE is calculated by hand after the shift, missing data is quietly counted as running, and nobody agrees on the number.

Early access

Built and tested in software, not yet proven on a plant line. Available to pilot plants.

How it works

Line Performance, step by step

  1. States come from the machineGorad Connect reads running and stopped straight from the PLC. Nobody fills in a sheet.
  2. Every stop gets a reasonOperators pick a reason on the tablet. A stop nobody answered stays "unspecified" and goes to review.
  3. Missing data stays missingWhen the readings stop, that time is "no data". It is never counted as running.
  4. One honest OEEAvailability × performance × quality, from those states, the part counts and the ideal cycle time.
Line 2 · day shift06:0008:0010:0012:0014:00Availability82 %Performance91 %Quality98 %OEE73 %

Step 1 of 4 · Example values

What it does

What Line Performance does

Live line view

Machine states and Andon calls as they happen, on a screen, a tablet or a TV board.

Andon

Calls from a PLC button or the tablet, with escalation when nobody responds.

Downtime with reasons

Every stop gets a reason. Stops nobody answered become "unspecified" and go to a review queue.

OEE with drill-down

Availability, performance and quality per line and shift, with ideal cycle times per part.

Governed policies

Plant policies are versioned. Changing them or recomputing a past shift needs a reason and re-authentication.

Reports

Ready to share

Shift report in PDF and Excel.

Advantages

What changes with Line Performance

Real numbers, not guesses

States and counts come from the machine, not from a sheet filled in at the end of the shift.

See losses as they happen

Live line view and Andon calls on screens, tablets and TV boards.

A reason for every stop

Stops get a reason; unanswered ones go to a review queue.

Honest about missing data

Time without readings is shown as “no data”, never counted as running.

Shift reports, done

A shift report in PDF and Excel at the end of every shift.

Rules it keeps

Built to stay honest

These rules are part of the app, not settings.

  • Missing or bad data is "no data", never counted as running.
  • A missing ideal cycle makes the result incomplete, never 0 % or 100 %.
  • Each line has one quality source, so rejects are never counted twice.
  • Line Performance never writes to a PLC.
On the platform

Works with

  • Same login, roles and audit trail as every Gorad app
  • Runs inside your plant, with offline licensing
Terms used on this page

In plain language

More terms in the glossary.

OEE
Overall equipment effectiveness: how much good output a machine makes compared with what it could make. Availability × performance × quality.
Availability
The share of planned time the machine was actually running.
Performance
How fast the machine ran compared with its ideal speed while it was running.
Andon
A signal, such as a button or a light, that calls for help when there is a problem on the line.
Ideal cycle time
The fastest time a machine can make one part. OEE performance is measured against it.
Downtime
Time a machine was stopped when it should have been running.
Questions

About Line Performance

Where does the data come from?

Machine states and counts come from your PLCs through Gorad Connect. Quality comes from good and reject counts, or from Gorad Vision verdicts.

What if the readings stop for a while?

That time is shown as “no data”. It is never counted as running, so OEE is never flattered.

What if we don’t know the ideal cycle time?

The result is marked incomplete instead of showing 0 % or 100 %. You can set ideal cycle times per machine and per part.

Does it control the machine?

No. Line Performance never writes to a PLC.

See Line Performance with your data

Tell us how you handle this today, and we will show you how Gorad Line Performance would fit.