Partners

Build cells on a vision platform you do not have to maintain

One product for every customer, a documented PLC handshake, and programs you can hand over to the plant. You deliver the cell; Gorad supplies and maintains the vision software.

Who it is for

Integrators, machine builders and automation partners

System integrators

You build inspection cells and robot cells. Gorad supplies the vision system and its software; you keep the mechanics, robot, electrics and PLC program.

Machine builders

You build machines and want inspection or clean machine data as an option, without writing and supporting your own vision software.

Automation partners

You commission lines for plants and want one supportable product instead of a custom project every time.

Why it is easier

Less custom code, less support after handover

  • The same tested product at every customer. Differences are configuration, never a code fork
  • Programs are signed and versioned, released over the network or by USB, and changed from the browser
  • Fail-closed by design: a fault rejects the part, so a cell never passes parts because something broke
  • Classical and AI tools in one program, trained and changed without a data scientist on site
  • Gorad Connect turns your machine’s PLC tags into standard events for OEE, SPC and the plant
Clear scope

Who does what

Gorad

  • Vision software, programs and AI models
  • Station hardware specification
  • Commissioning support and documentation

Integrator or machine builder

  • Mechanics, robot and fixtures
  • Cell electrics and lighting mounts
  • The PLC program, using the signal map below
PLC handshake

A standard signal map

The same signals at every station, over Modbus TCP, Siemens S7 or OPC UA. Addresses are configured per cell: coils and registers, DB offsets, or node IDs.

SignalDirectionMeaning
ReadyStation → PLCThe station is ready for a trigger
TriggerPLC → StationStart the inspection cycle
ResultOK / ResultNGStation → PLCWritten after the journal, then read back to confirm; a mismatch raises Line unsafe
HeartbeatStation → PLCToggles every 0.5 s while the station is healthy. Your PLC watchdog stops or diverts when it stops toggling
LineUnsafeStation → PLCA safety, journal or PLC fault
PartTokenPLC → StationOptional part ID
ProgramSelectPLC → StationOptional program index for changeover
AckPLC → StationAcknowledges the result
InPosition / CaptureDoneRobot ↔ StationPer position, for multi-position robot cells

Commissioning, PLC and camera guides are shared with partners.

How it works

How partnering starts

  1. Talk

    Tell us what you build and for whom, and which cells could use vision or machine data.

  2. First cell together

    We work on one real cell with you, from samples to commissioning.

  3. Hand over

    Your team learns to commission and change programs, with our engineers behind you.

  4. Agree terms

    Partner terms are agreed once the first cell has shown what the work involves.

Building a cell that needs vision?

Tell us about the machine or the cell. We will tell you honestly whether Gorad fits, and how we would work together.